FY06 Enlisted Grade Structure Review (EGSR) Procedures and Administrative Instructions for Phase II Implementation and Phase III Execution
This MARADMIN provides detailed procedures for implementing Phase II MOS Manual purge changes and outlines the plan for Phase III of the FY06 Enlisted Grade Structure Review (EGSR). The message addresses both officer and enlisted occupational field sponsors, detailing the timeline for updating HRDP information systems with new MOS changes and cleansing all manpower requirements data within TFSMS to ensure adherence to agreed-upon business rules.
Issued: April 6, 2006
1. PURPOSE. THIS MESSAGE PROVIDES DETAILED PROCEDURES AND ADMINISTRATIVE INSTRUCTIONS FOR IMPLEMENTATION OF FY06 EGSR PHASE II MOS MANUAL PURGE CHANGES, AND OUTLINES THE PLAN OF ACTION AND MILESTONES FOR PHASE III. BOTH OFFICER AND ENLISTED OCCUPATIONAL FIELD (OCCFLD) SPONSORS ARE EXPECTED TO REVIEW THIS MESSAGE. 2. BACKGROUND. REF (A) DIRECTED DC, MRA AND DC, CDI TO CONDUCT A GRADE STRUCTURE REVIEW. REF (B) ANNOUNCED THE FY06 EGSR. REF (C) IS THE EGSR LETTER OF INSTRUCTION SIGNED BY DC, MRA AND DC, CDI, WHICH OUTLINES GUIDANCE AND RESPONSIBILITIES. REF (D) OUTLINED THE GOALS AND PROCEDURES FOR PHASE I OF THE EGSR. REF (E) OUTLINED THE GOALS AND PROCEDURES FOR PHASE II OF THE EGSR, WHICH WERE LATER ADJUSTED TO ACCOMMODATE AN MOS MANUAL PURGING EFFORT EXPLAINED IN REF (F). 3. PHASE II MOS MANUAL PURGE IMPLEMENTATION A. PER REF (C), ONE OF THE OBJECTIVES OF THE FY06 EGSR WAS TO CLEANSE ALL MANPOWER REQUIREMENTS DATA (TO INCLUDE A REVIEW OF THE ATTRIBUTION OF B-BILLETS TO PMOS) UTILIZING THE HUMAN RESOURCE DEVELOPMENT PROCESS (HRDP) AND TOTAL FORCE STRUCTURE MANAGEMENT SYSTEM (TFSMS) BUSINESS RULES AGREED UPON DURING PHASE I. B. IN KEEPING WITH THIS GOAL, THE EGSR WORKING GROUP (WG) ASSISTED TRAINING AND EDUCATION COMMAND (TECOM) IN THEIR EFFORTS TO STANDARDIZE AND TRANSFORM MCO P1200.16 (MOS MANUAL) INTO A DATA-BASED RESOURCE. THESE MODIFICATIONS TO THE MOS MANUAL INCREASED THE ABILITY TO ACCURATELY CAPTURE MANPOWER REQUIREMENTS, AND FURTHERED THE ACCOMPLISHMENT OF TECOM'S GOAL TO CREATE AN ELECTRONIC INTERFACE BETWEEN THE NEW AUTOMATED CAREER RETENTION SYSTEM AND THE MOS MANUAL. TECOM WILL BE RELEASING, IN CONJUNCTION WITH THE PUBLISHING OF THENEW MOS MANUAL, A MESSAGE ILLUSTRATING ALL OF THE MOS CHANGES INCORPORATED INTO THIS VERSION OF THE MANUAL. A COPY OF THE MOS CONVERSION TABLE WILL BE VIEWABLE ON TECOM'S WEBSITE AT THE HTTP ADDRESS WWW.TECOM.USMC.MIL/GTB/TDS/ UNDER "MOS MANUAL" AS OF THE SCHEDULED MOS MANUAL PUBLISHING DATE (15 APR 06). C. EVERY YEAR, CHANGES TO THE MOS MANUAL NECESSITATE HRDP INFORMATION SYSTEM UPDATES. THIS YEAR IS NO EXCEPTION, HOWEVER, THE VOLUME OF CHANGES PROPOSED IN THE MOS MANUAL PURGE WARRANTS AN OUTLINE OF AN HRDP INFORMATION SYSTEM INTEGRATION PLAN (NOTE: NORMAL CONVERSION GUIDANCE AS PER CHAPTERS 2 AND 4 OF THE MOS MANUAL REMAINS GERMANE): APR 06 - TFSMS PRODUCTION RUN (AUTHORIZED STRENGTH REPORT) APR 06 - TFSMS PRODUCTION RUN RESULTS PUBLISHED USING PRESENT DAY MOS'S APR 06 - OFFICER / ENLISTED STAFFING GOAL MODELS (SGM'S) AND GRADE ADJUSTED RECAPITULATION (GAR) EXECUTED BASED ON PRESENT DAY MOS'S APR 06 - NEW MOS'S ADDED TO MOS VALIDATION TABLE IN TFSMS, NEW MOS MANUAL RELEASED APR THRU AUG 06 - MCTFS, STAFFING GOAL MODELSS, GAR, WEBMASS, TFSMS (ALL SERVERS) UPDATED WITH NEW MOS'S AUG 06 - OLD MOS'S PULLED FROM TFSMS MOS VALIDATION TABLE, TFSMS PRODUCTION RUN SEPT 06 - TFSMS PRODUCTION RUN RESULTS PUBLISHED USING NEW MOS'S 4. PHASE III PROCEDURES AND INSTRUCTIONS A. WITH THE COMPLETION OF THE PHASE II MOS MANUAL PURGE, THE EGSR WG IS NOW POISED TO ASSIST THE OCCFLD SPONSORS WITH THEIR PHASE III DUTIES. THE FOCUS OF EFFORT FOR PHASE III IS TO CLEANSE ALL (BOTH OFFICER AND ENLISTED REQUIREMENTS) DATA WITHIN TFSMS TO ENSURE ADHERENCE TO THE AGREED UPON HRDP AND TFSMS BUSINESS RULES (THE HRDP BUSINESS RULES CAN BE VIEWED UNDER "REFERENCE" AT THE HTTPS ADDRESS WWW.MANPOWER.USMC.MIL/PORTAL/PAGE?_PAGEID=278,1950783&_DAD=PORTAL&_ SCHEMA=PORTAL). AN ADDITIONAL GOAL OF PHASE III IS TO TRAIN THE OCCFLD SPONSORS ON THE TFSMS EGSR MODULE SO THEY ARE PREPARED TO EXECUTE PHASE IV ENLISTED GRADE SHAPING. B. TIMELINE FOR PHASE III: APR 06 - TFSMS PRODUCTION RUN, OCCFLD SPONSOR INTERVIEWS FOR THOSE WITH BUSINESS RULE VIOLATIONS 1 JUN 06 - DATA CLEANSING TOECRS SUBMITTED TO TOTAL FORCE STRUCTURE DIVISION (TFSD) 30 JUL 06 - ALL STRUCTURAL DATA CLEANSED WITHIN TFSMS TO INCLUDE ALL PHASE II MOS MANUAL PURGE CHANGES AUG 06 - PRODUCTION RUN, TFSMS EGSR MODULE TRAINING, PHASE III COMPLETE *A DETAILED INTERVIEW SCHEDULE ASSIGNING EACH AFFECTED OCCFLD SPONSOR TO A TIME SLOT AND LOCATION WILL BE RELEASED VIA SEPCOR. D. SPECIFIC DATES AND TIMES FOR AUGUST TFSMS EGSR MODULE TRAINING WILL BE PUBLISHED VIA SEPCOR. PER REF (F), OVERALL EGSR TIMELINE REMAINS ON TRACK FOR FEBRUARY 07 COMPLETION.