Ground Range Sustainment Program
This MARADMIN establishes the Ground Range Sustainment Program (GRSP), a partnership between TECOM, PM TRASYS, and NSWC Corona to provide funding for ground training range improvements and sustainment projects that cannot be accomplished within existing operating and maintenance budgets. The program complements the existing Navy SRAM program by focusing on non-aviation range requirements, with projects typically not exceeding $200K in cost.
Issued: April 28, 2003
1. PURPOSE. THE RANGE AND TRAINING AREA MANAGEMENT DIVISION OF TRAINING AND EDUCATION COMMAND HAS PARTNERED WITH THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND (PM TRASYS) AND THE NAVAL SURFACE WARFARE CENTER, CORONA DIVISION (NSWC CORONA) TO ESTABLISH A GROUND RANGE SUSTAINMENT PROGRAM (GRSP). THE PURPOSE OF THIS DOCUMENT IS TO PROVIDE THE BASICS OF THE PROGRAM SO THAT POTENTIAL PROJECTS CAN BE IDENTIFIED AND SUBMITTED FOR CONSIDERATION TO TAKE ADVANTAGE OF THIS YEAR'S FUNDING. 2. BACKGROUND. THE NAVY SYSTEMS REPLACEMENT AND MODERNIZATION (SRAM) PROGRAM, ADMINISTERED BY NSWC CORONA, HAS HISTORICALLY PROVIDED FUNDING FOR QUALIFIED PROJECTS RELATED TO AVIATION TRAINING RANGES. THE GRSP IS INTENDED TO COMPLEMENT THE SRAM PROGRAM BY MEETING RANGE REQUIREMENTS THAT DO NOT NECESSARILY HAVE A LINK TO AVIATION. THIS PROGRAM WILL GATHER POTENTIAL PROJECTS FOR GRSP FUNDING, COMPLETE BASIC ENGINEERING/COSTING DATA FOR PROJECTS, PRIORITIZE THE PROJECTS TO BE FUNDED, AND FUND THE APPROVED PROJECTS ACCORDING TO THE PRIORITIZATION AND LIMITS OF THE GRSP BUDGET. 3. STRATEGY. THE FUTURE INVESTMENT STRATEGY FOR RANGES AND TRAINING AREAS WILL HAVE THREE MAIN PILLARS; SUSTAINMENT, UPGRADE AND MODERNIZATION/TRANSFORMATION. THESE ARE DISCUSSED BRIEFLY BELOW: A. SUSTAINMENT. REFERS TO ACCOMPLISHING TODAY'S TRAINING TODAY USING IMPROVEMENTS OR REPLACEMENT OF EXISTING TRAINING DEVICES SUCH AS LIFTERS, WORN TARGETS, AND RANGE CONTROL COMPUTERS THAT CANNOT BE ACCOMPLISHED WITHIN EXISTING OPERATING AND MAINTENANCE (O&M) BUDGETS. MAINTENANCE OF "STATE OF THE ART" RANGE CONTROL SYSTEMS ALSO SUPPORTS CURRENT TRAINING REQUIREMENTS. THIS IS THE AREA WHERE GRSP WILL BE MOST USED. B. UPGRADE. REFERS TO PERFORMING TODAY'S TRAINING BETTER TOMORROW AND IS ACCOMPLISHED BY PURCHASING IMPROVEMENTS IN TARGETRY, THREAT EMITTERS, SHOOT-BACK DEVICES AND OTHER RANGE AND TRAINING AREA TECHNOLOGY. REMOTE ENGAGEMENT TARGET SYSTEM (RETS) INSTALLATION IS AN EXAMPLE OF A RANGE UPGRADE. UPGRADES NORMALLY EXCEED THE CAPABILITY OF THE BASE COMMANDER TO ACCOMPLISH WITHIN HIS O&M BUDGET SO THEY COMPETE FOR FUNDING THROUGH THE BUDGETING PROCESS. C. MODERNIZATION/TRANSFORMATION. REFERS TO IMPROVING RANGES AND TRAINING AREAS TO ACCOMPLISH TOMORROW'S TRAINING TOMORROW. REQUIREMENTS FOR THIS TYPE OF INVESTMENT COME FROM CONCEPTUAL PUBLICATIONS SUCH AS EXPEDITIONARY MANEUVER WARFARE (EMW), SHIP TO OBJECTIVE MANEUVER (STOM) AND FROM THE FIELDING OF NEW WEAPON SYSTEMS. CONCEPTS SUCH AS THIS, IF NOT PLANNED FOR, WILL BE IMPLEMENTED WITH NO PREPARED TRAINING FACILITIES. IT IS ESSENTIAL THAT FACILITIES BE PLANNED AND CONSTRUCTED TO PROVIDE NECESSARY LOCATIONS FOR MARINES TO TRAIN. INVESTMENTS OF THIS TYPE FALL PRINCIPALLY INTO THE MILITARY CONSTRUCTION (MILCON), AND TO A LESSER DEGREE, PMC FUNDING CATEGORIES. 4. GRSP VITILIZATION. THE HIGHEST PRIORITY FOR GRSP IS ACCORDED TO SUSTAINING EXISTING CAPABILITIES FOR CONTINUITY OF MARINE CORPS TRAINING. THE NATURE OF THIS IS SUCH THAT REQUIREMENTS OFTEN CANNOT BE FORESEEN AND WOULD NOT BE FUNDED IN A TIMELY MANNER IF SUBJECTED TO THE CONSTRAINTS OF THE PROGRAM OBJECTIVE MEMORANDUM (POM) BUDGET CYCLE. FUNDING OF SPECIFIC PROJECTS, USING O&M FUNDS MANAGED AT THE INSTITUTIONAL LEVEL, IS THE INTENTION OF THE GRSP. THE COST OF MATERIALS AND INSTALLATION FOR GRSP PROJECTS WILL NOT NORMALLY EXCEED $200K. COMMANDING GENERAL, TECOM IS THE WAIVER AUTHORITY FOR PROJECTS EXCEEDING THIS AMOUNT. A. REQUIREMENTS AUTHORIZED UNDER THE GRSP WILL INCLUDE: 1) EXPANDING OR ALTERING THE CAPABILITIES OF EXISTING SYSTEMS. 2) UPGRADING EXISTING SYSTEM COMPONENTS. 3) SIMPLIFYING OPERATION AND/OR MAINTENANCE. 4) PROVIDING FOR PERSONNEL AND OPERATIONAL SAFETY AND SECURITY OF INSTALLED GROUND RANGE SYSTEMS AND EQUIPMENT. 5) SUSTAINING AND REPLACING GROUND RANGE AND TRAINING AREA CAPABILITIES. B. THE FOLLOWING ARE SPECIFICALLY EXCLUDED FROM BEING REPLACED/SUSTAINED WITH GRSP O&M, MC FUNDS: 1) FUNCTIONS EXCLUSIVELY FUNDED UNDER THE BASE OPERATING SUPPORT (BOS) APPROPRIATION. EXAMPLES INCLUDE RANGE MAINTENANCE AND EQUIPMENT OR SYSTEM REPAIRS/OVERHAUL. 2) BUILDING/FACILITY CONSTRUCTION PROJECTS EXCLUSIVELY FUNDED UNDER THE MILITARY CONSTRUCTION (MILCON) APPROPRIATION. 3) SUPPORT EQUIPMENT (SE) SUCH AS EQUIPMENT APPEARING ON AN ACTIVITY'S TABLE OF EQUIPMENT (T/E) LIST, EQUIPMENT ON ANY COMPARABLE/CORRESPONDING ALLOWANCE LIST, SE USED FOR GENERAL PURPOSE (NON-RANGE) MAINTENANCE SUCH AS VEHICLES, BOATS, AND LAWN MOWERS. 4) CONSUMABLE ITEMS ARE THE RESPONSIBILITY OF THE OPERATING ACTIVITY. FOR EXAMPLE, BATTERIES AND TARGETS ARE NOT VALID GRSP ITEMS AND SHOULD BE OBTAINED WITH ACTIVITY BOS FUNDS. 5) REPLENISHMENT OF SPARE OR REPAIR PARTS. 6) EXERCISE INSTRUMENTATION (E.G. MULTIPLE INTEGRATED LASER ENGAGEMENT SYSTEM (MILES-2000), POSITION LOCATION INSTRUMENTATION (PLI), INDOOR SIMULATED MARKSMANSHIP TRAINER (ISMT), AND THE INFANTRY SQUAD TRAINER (IST)) 7) COMPUTER EQUIPMENT USED FOR ADMINISTRATIVE FUNCTIONS. 8) INSTALLATION OF SYSTEMS/EQUIPMENT NOT PROCURED UNDER THE GRSP PROGRAM AND REINSTALLATION/RELOCATION OF PREVIOUSLY INSTALLED SYSTEMS/EQUIPMENT. 5. GRSP CYCLE. GRSP WILL FUNCTION ON AN ANNUAL CYCLE AS OUTLINED BELOW: A. BEGINNING IN THE FALL OF EACH YEAR, THE BASES AND STATIONS WILL GATHER POTENTIAL RANGE AND TRAINING AREA INVESTMENT PROJECTS THAT WILL BE SUBMITTED INTO A DATABASE ACCESSIBLE VIA THE RANGE AND TRAINING AREA MANAGEMENT DIVISION PAGE OF THE TECOM WEBSITE (CURRENTLY UNDER DEVELOPMENT). B. DURING THE PERIOD JANUARY TO MARCH EACH YEAR, A VISITATION TEAM MADE UP OF OFFICIALS FROM TECOM, NSWC AND MARCORSYSCOM WILL VISIT ALL THE BASES TO VALIDATE THE PROJECTS THAT WERE SUBMITTED VIA THE WEBSITE. C. DURING APRIL AND MAY, THE PROJECTS WILL BE RESEARCHED AND PRICED OUT BASED ON ENGINEERING DATA COLLECTED BY THE VISITATION TEAM. THE PRICED AND VALIDATED PROJECTS WILL THEN BE SUBMITTED TO THE MARFORS FOR PRIORITIZATION. D. DURING JUNE, MARFORS WILL PASS THEIR PRIORITIZED PROJECTS TO TECOM FOR CONSOLIDATION AND FINAL USMC PRIORITIZATION. E. IN JULY, A PRIORITIZATION BOARD MADE UP OF OFFICIALS REPRESENTING THE ADVOCATES, TECOM, MARCORSYSCOM AND NSWC WILL MEET TO ESTABLISH THE CONSOLIDATED PRIORITIZATION LIST. MARFORS WILL BE GIVEN THE OPPORTUNITY TO BRIEF THEIR PROJECTS AS DESIRED. BASED ON THIS PRIORITIZATION AND GIVEN THE FUNDING LEVEL AUTHORIZED FOR THAT PARTICULAR YEAR, THE APPROVED PROJECTS WILL BE FUNDED. INITIALLY, THE FUNDING CEILING FOR GRSP PROJECTS IS EXPECTED TO BE SET AT $200K BUT MAY BE ADJUSTED BY CG TECOM GIVEN SUFFICIENT JUSTIFICATION. PROJECTS THAT FALL BELOW THE CUT LINE WILL BE REVALIDATED DURING THE FOLLOWING GRSP CYCLE. F. THE PRIORITIZED LIST OF PROJECTS IS THEN SUBMITTED TO CG TECOM FOR APPROVAL OF THE ACQUISITION PLAN. GUIDANCE WILL THEN BE PROVIDED TO MARCORSYSCOM TO ACQUIRE THE NECESSARY MATERIALS TO ACCOMPLISH THE PROJECT. THIS WILL TAKE PLACE IMMEDIATELY AFTER THE PRIORITIZATION BOARD TO ENSURE THAT THE FUNDS ARE EXPENDED DURING THE YEAR THEY ARE AUTHORIZED. ONCE COMPLETE, THE CYCLE BEGINS AGAIN FOR THE FOLLOWING YEAR. 6. THE CYCLE OUTLINED ABOVE WILL BE MODIFIED FOR FY-03 BECAUSE OF DELAYS IN THE PROGRAM START. BASES AND STATIONS WILL BE NOTIFIED BY NAVAL MESSAGE AND ELECTRONIC MAIL OF THIS YEARS REQUIREMENTS.