DTAS Fielding and Training Plan-Pre-Fielding Message (Corrected Copy)
This MARADMIN announces the fielding and training plan for the Deployed Theater Accountability System (DTAS), a SIPRNET-enabled personnel tracking system mandated by the Office of Secretary of Defense. All Marine Corps units preparing to deploy to the CENTCOM Area of Responsibility must prepare to use DTAS upon arrival, with instructor-level training scheduled for July 19-21, 2005, at Camp Johnson.
Issued: June 28, 2005
1. PURPOSE. OFFICE OF SECRETARY OF DEFENSE (OSD) HAS MANDATED EACH MILITARY SERVICE ENHANCE THEIR PERSONNEL SYSTEMS TO CAPTURE AND REPORT HISTORICAL LOCATION INFORMATION ON DEPLOYED PERSONNEL. MARFORPAC UNIVERSAL NEEDS STATEMENT ALSO IDENTIFIED REQUIREMENT FOR MARINE CORPS TO HAVE ABILITY TO TRACK DEPLOYED PERSONNEL. PER THE REFS MANPOWER AND RESERVE AFFAIRS DEPARTMENT (M-RA) AND MARINE CORPS SYSTEMS COMMAND (MCSC) HAVE INTEGRATED EFFORTS WITH THE U.S. ARMY FIELD SYSTEMS DIRECTORATE (FSD) FOR DEVELOPMENT OF DEPLOYED THEATER ACCOUNTABILITY SOFTWARE (DTAS). OVER THE PAST EIGHT MONTHS DTAS HAS BEEN SUCCESSFULLY TESTED AND FIELDED TO MARINE UNITS IN SUPPORT OF OPERATION IRAQI FREEDOM OPERATION ENDURING FREEDOM (OIF-OEF). DTAS WILL BE USED TO CAPTURE INDIVIDUAL DEPLOYED LOCATION INFORMATION FOR ALL FUTURE OIF DEPLOYMENTS. 2. BACKGROUND A. DTAS PROVIDES UNIT COMMANDERS AND HIGHER HEADQUARTERS STAFF WITH AN EFFICIENT SIPRNET ENABLED CAPABILITY TO TRACK AND REPORT ALL PERSONNEL ASSIGNED BY NAME-SSN, UNIT, AND LOCATION (6 DIGIT GRID COORDINATE) ON A DAILY BASIS. DTAS PRODUCES PERSONNEL STATUS (PERSTAT), JOINT PERSONNEL STATUS (JPERSTAT), AND OTHER PERSONNEL ACCOUNTABILITY REPORTS AND POSTS THE DATA TO A CENTRAL REPOSITORY ACCESSIBLE VIA SIPRNET. B. MARCORSYSCOM CONDUCTED A THOROUGH GAP ANALYSIS BETWEEN DTAS AND EXISTING MARINE CORPS DEPLOYED TRACKING APPLICATIONS AND HAS DETERMINED THAT DTAS BEST MEETS THE REQUIREMENTS OUTLINED IN PARAGRAPH 1. C. CURRENTLY DTAS OBTAINS MARINE PERSONNEL DATA FROM THE MARINE CORPS TOTAL FORCE SYSTEM (MCTFS) AND USES DEFENSE MANPOWER DATA CENTER (DMDC) DATA TO VALIDATE PERSONNEL INFORMATION. D. ACCREDITATION AND APPROVAL TO OPERATE DTAS HAS BEEN GRANTED BY MARCORSYSCOM, C4I-I, JUNE 22, 2005. 3. FIELDING PLAN. A. DTAS TEAM WILL PROVIDE SUBJECT MATTER EXPERTS TO FIELD DTAS AND HELP UNITS CONFIGURE THE SYSTEM TO MEET FORTHCOMING INITIALIZATION REQUIREMENTS. UNITS WILL PROVIDE SIPRNET LAPTOPS FOR DTAS TEAM TO LOAD DTAS SOFTWARE FOR CONNECTION AND ACTIVATION CAPABILITY. B. INITIAL OPERATIONAL CAPABILITY (IOC) WAS ACHIEVED WHEN INITIAL FIELDING, TESTING, AND SUCCESSFUL UNIT ACTIVATION OF DTAS WAS ACHIEVED IN FEBRUARY 2005. FINAL OPERATIONAL CAPABILITY (FOC) FOR DTAS WAS ACHIEVED WHEN 84 UNITS (MARINE UNITS AND OTHER SERVICE UNITS ASSIGNED TO MARINE UNITS) UNDER COALITION FORCES LAND COMPONENT COMMAND (CFLCC) HAD BEEN ACTIVATED AND TRAINED IN MARCH 2005. C. ALL MARINE CORPS UNITS PREPARING TO REPORT TO THE CENTCOM AREA OF RESPONSIBILITY (AOR) MUST PREPARE THEMSELVES TO USE DTAS UPON REPORTING TO THE AOR. D. DTAS WILL ADHERE TO A SPIRAL DEVELOPMENT APPROACH TO SATISFY UNKNOWN FUTURE REQUIREMENTS. THEREFORE, TRAINING AND FIELDING WILL CONTINUE WITH EVERY UPDATE-ENHANCEMENT OF DTAS. THE NEXT SCHEDULED FIELDING IS THE AERIAL PORT OF DEBARKATION (APOD) MODULE IN JULY 2005 AND THE NEXT SOFTWARE RELEASE OF VERSION 3.0 DURING THE FIRST QUARTER OF FY 2006. 4. STRATEGIC TRAINING. A. IN PREPARATION FOR THE UPCOMMING MEF TURNOVER THE DTAS TEAM WILL PROVIDE INSTRUCTOR LEVEL TRAINING 19-21 JULY 2005 AT MISSO-2 ABOARD CAMP JOHNSON. THE TARGET AUDIENCE FOR THIS TRAINING IS REPRESENTATIVES FROM THE MEFS WHO WILL BE RESPONSIBLE FOR CONDUCTING DTAS TRAINING FOR THEIR DEPLOYING UNITS. DURING NOVEMBER 2005 THE MARINE THEATER MANAGER HELP DESK AND DTAS TEAM REPS WILL PROVIDE DTAS SOFTWARE VERSION 3.0 TO USING UNITS AND PROVIDE TRAINING IN THEATER PRIOR TO SCHEDULED FIELDING IN DECEMBER 2005. B. INSTRUCTOR LEVEL TRAINING CONCENTRATES ON THE MOBILE SYSTEM, I.E. SIPRNET LAPTOPS FOR G-1 AND S-1 REPRESENTATIVES, THEATER DATA BASE MANAGEMENT AND BOTH THEATER AND ENTERPRISE DATA STORE CAPABILITIES. ADMIN SECTION REPS WILL BE PROVIDED WITH HANDS ON TRAINING, A WORKING KNOWLEDGE OF DTAS FUNCTIONALITY THAT RELATES TO MOBILE USERS' DAILY TASKS, AND THE MANAGEMENT REQUIRED BY HEADQUARTERS ELEMENTS. TRAINING INCLUDES AN INTRODUCTION TO DTAS AND DATA STORE OUTPUT USING COGNOS SOFTWARE. C. UNIT LEVEL MOBILE SYSTEM AND THEATER MANAGEMENT TRAINING WILL BE PROVIDED TO EACH DEPLOYING UNIT ADMINISTRATION OFFICE PRIOR TO DEPLOYMENT. THE DTAS TEAM WILL PROVIDE TRAINING TO MISSO AND UNIT LEVEL REPRESENTATIVES AS REQUIRED. THE LOCAL MISSO'S WILL PROVIDE A DTAS OVERVIEW AS PART OF THE PRE-DEPLOYMENT SUPPORT FOR DEPLOYING UNITS. 5. SUPPORT PLAN. THERE ARE THREE LAYERS OF TECHNICAL SUPPORT: TIER I IS THE THEATER MANAGERS (ARMY AND MARINE CORPS); TIER II IS THE ARMY'S FIELD SYSTEMS DIRECTORATE (FSD), DESIGN AND DEVELOPMENT DIVISION; AND TIER III IS THE DEVELOPER OF DTAS, ELECTRONIC DATA SYSTEMS (EDS). EDS IS RESPONSIBLE FOR MAINTAINING THE SOFTWARE AND THE THEATER AND ENTERPRISE HARDWARE SUITES FOR HIGH LEVEL DTAS OPERATIONAL CAPABILITY. THE FIRST RESPONDER TO ADDRESS ANY HARDWARE - SOFTWARE ISSUES IS THE THEATER MANAGER AND THE LAST RESPONDER TO CORRECT ESCALATED ISSUES IS THE DEVELOPER. 6. COORDINATING INSTRUCTIONS. REQUEST THAT MARFORS PROVIDE A SINGLE POC AND ALSO PROVIDE POCS AT MARCENT AND MEFS TO PARTICIPATE IN THE INSTRUCTOR TRAINING AND COORDINATE ALL INSTALLATION, OPERATION AND TRAINING REQUIREMENTS FOR THEIR RESPECTIVE SUBORDINATE COMMANDS. PROVIDE LTCOL MARCUS MESSINA AND KIL (PAUL) YOON WITH THE FOLLOWING POC INFORMATION NLT 15 JULY 2005: ORGANIZATION, NAME, RANK, TELEPHONE NUMBER, AND EMAIL ADDRESS.