FY06 Enlisted Grade Structure Review (EGSR) Updated Procedures and Administrative Instructions
This MARADMIN provides updated procedures and administrative instructions for the FY06 Enlisted Grade Structure Review (EGSR), specifically addressing the remainder of Phase II. The review timeline has been extended by six months to incorporate a comprehensive purging and standardization of the MOS Manual, with final completion now scheduled for the February 2007 production run instead of August 2006.
Issued: December 5, 2005
1. PURPOSE. THIS MESSAGE PROVIDES DETAILED PROCEDURES AND ADMINISTRATIVE INSTRUCTIONS FOR THE REMAINDER OF PHASE II, AND OUTLINES THE PLAN OF ACTION AND MILESTONES FOR THE REMAINDER OF THE FY06 EGSR. 2. BACKGROUND A. REF A DIRECTED DC, M&RA AND DC, CD&I TO CONDUCT A GRADE STRUCTURE REVIEW. REF B ANNOUNCED THE FY06 EGSR AND REF C PROVIDED FURTHER DETAILS. REF D OUTLINED THE GOALS AND PROCEDURES FOR PHASE I OF THE EGSR, WHILE REF E DID THE SAME FOR PHASE II. B. PER THE REFS, THE FY06 EGSR WAS TO BE COMPRISED OF THREE PHASES, TAKE APPROXIMATELY 16 MONTHS TO COMPLETE, AND SPAN THREE PRODUCTION RUN CYCLES. PER REF C, THE OBJECTIVES OF PHASE II WERE TO CLEANSE ALL MANPOWER REQUIREMENTS DATA (TO INCLUDE A REVIEW OF THE ATTRIBUTION OF B-BILLETS TO PMOS) UTILIZING THE HUMAN RESOURCE DEVELOPMENT PROCESS (HRDP) AND TOTAL FORCE STRUCTURE MANAGEMENT SYSTEM (TFSMS) BUSINESS RULES AGREED UPON DURING PHASE I. THE CLEANSED DATA WAS THEN TO BE UPLOADED INTO TFSMS PRIOR TO THE FEB 2006 PRODUCTION RUN. C. IN KEEPING WITH THE GOALS OUTLINED FOR PHASE II, THE EGSR WORKING GROUP (WG) DECIDED TO ASSIST TRAINING AND EDUCATION COMMAND (TECOM) IN THEIR EFFORTS TO STANDARDIZE AND TRANSFORM MCO P1200.16, MILITARY OCCUPATIONAL SPECIALTIES MANUAL (MOS MANUAL) INTO A DATA-BASED RESOURCE. THESE MODIFICATIONS TO THE MOS MANUAL INCREASE THE ABILITY TO ACCURATELY CAPTURE MANPOWER REQUIREMENTS, AND ENABLES AN ELECTRONIC INTERFACE BETWEEN THE NEW AUTOMATED CAREER RETENTION SYSTEM AND THE MOS MANUAL. D. ALTHOUGH THIS EFFORT EXTENDS THE WORKING TIMELINE OF THE EGSR BY SIX MONTHS, ALL EGSR PRODUCTS WILL BE IN PLACE IN TIME TO AFFECT FY08 STRUCTURE AS ORIGINALLY PLANNED, AND THE END PRODUCT WILL BE IMPROVED BECAUSE USERS WILL BE SHAPING THE MOST ACCURATE STRUCTURAL REQUIREMENTS POSSIBLE. 3. PROCEDURES AND INSTRUCTIONS. A. PHASE II CONTINUES TO TAKE PLACE THROUGH 28 FEB 06, THE FOCUS OF EFFORT IS THE PURGING OF THE MOS MANUAL. B. AN MOS MANUAL WG WAS FORMED WITH MEMBERS OF TOTAL FORCE STRUCTURE DIVISION (TFSD), RA, MPP-50, MMEA, MMOA, MI, AND TECOM. ITS GOAL WAS TO FIND THE MOST EFFICIENT AND EFFECTIVE WAY TO STANDARDIZE THE MOS MANUAL IN ORDER TO MOST ACCURATELY CAPTURE MANPOWER REQUIREMENTS, AND AFFECT THE ELECTRONIC INTERFACE BETWEEN IT AND THE NEW AUTOMATED CAREER RETENTION SYSTEM. AS OF 31 OCT 05, THE WG HAS CONCEIVED NEW CATEGORIES AND TYPES OF MOS'S, AND HAS RE- DISTRIBUTED ALL CATEGORY B, SPECIAL EDUCATION PROGRAM, AND IDENTIFYING AND REPORTING MOS'S INTO THESE NEW TYPES AND CATEGORIES. THE WG HAS ALSO EARMARKED ALL MOS'S WITHOUT ASSOCIATED STRUCTURE FOR DELETION. C. THE WG IS CURRENTLY STAFFING ITS RESULTS VIA MCATS AND EMAIL TO ALL THE ADVOCATES AND OCCUPATIONAL FIELD SPONSORS FOR CONCURRENCE BEFORE IMPLEMENTING THE CHANGES WITHIN THE TOTAL FORCE STRUCTURE MANAGMENT SYSTEM (TFSMS), MOS MANUAL, AND THE MARINE CORPS TOTAL FORCE SYSTEM (MCTFS). CONCURRENCE / NON-CONCURRENCE SHOULD BE TRANSMITTED TO TECOM POC MR RANDEL WEBB BY 02 DECEMBER 05. D. DUE TO THE MOS MANUAL PURGING EFFORT, CONCLUSION OF THE EGSR WILL NOW BE THE FEB 07 PRODUCTION RUN VICE THE AUG 06 PRODUCTION RUN. THE NEW TIMELINE IS AS FOLLOWS: PHASE II MISSION COMPLETE BY FEB 06 PRODUCTION RUN, PHASE III DATA CLEANSING MISSION COMPLETE BY AUG 06 PRODUCTION RUN, AND PHASE IV GRADE SHAPING MISSION COMPLETE BY FEB 07 PRODUCTION RUN.